Please find below some of our mix of old and  new executed project with Clients name. More info can be provided upon request:

 

S. No. Our Ref. PO No. End User Description Scope Year
1 SN61373 450155**** SAHARA New Heater installation 2015
2 SN61737 440000**** SEC Rehabilitation of I & C Workshop at Rabigh Power Plant 2015
3 SN61055 450474**** SWCC- SHUQAIQ SWCC SHUQAIQ Workshop Project Rehabilitation of I & C Workshop 2014
4 SN60920            JB/GI/*** SWCC-Jubail Rehabilitation of I & C Workshop at Jubail Plant with Civil facility and building. 2014
5 Ref Ref SAHARA Reactor Temp motoring system with 23 Transmitters 2104
6 Ref Ref SHARQ – SABIC LSTK TO INSTALL TSO SHUT-OFF VALVES AT 1 &2 PE 2014
2 SN61488 450163**** SHARQ – SABIC LSTK of additional FCV for RO injection (Angle Control Valves) 2014
3 SN61566 450163**** SHARQ – SABIC LSTK PR FOR INSTALLATION OF ROTAMETERS 2014
4 SN61497 450164**** SHARQ – SABIC LSTK of LSL/TG in Mech seal coolant pump, Instruments supply and installations 2014
5 SN61619 450171**** SHARQ – SABIC LSTK project for Compressor Temperature Indications at 3EG plant 2014
6 SN61584 4500014**** SAHARA LSTK for Radar Type Level Instrument supply & Installation 2015
7 SN61688 450173**** KEMYA – SABIC Prover Calibration Services 2014
8 SN60920 JB/GI/*** SWCC – Jubail Renovation Supply, Installation & Commissioning of E&I workshop at SWCC-Jubail 2014
 9 G8097Q AF-051****

 

KEMYA-E&PM

SABIC

Kemya instrumentation Improvement for Finishing FEED Bins Project

 

2012
 10 SN60998 4501367**** SABIC -Yanpet TDC-2000 upgrade 2013
 11 G9136 450077**** PETRO KEMYA

SABIC

PDS Valves Modifications 1 2012
 12 G9172 450078**** PETRO KEMYA

SABIC

PDS Valves Modifications 2 2012
 13 G9229Q AF-072**** PETRO KEMYA

SABIC

Nitrogen Blanket System Renovation, Design, Supply and Commissioning support 2012
 14 G10026Q

 

600069**** ALBAYRONI- SABIC Supply & Installation of new Level Transmitters as LSTK for boiler steam drum 2012
 15 Ref Ref HADEED- SABIC MTCE workshop Test Lab renovation and modernization with Time Electronics Products 2012
 16 Ref Ref SHARQ- SABIC SHARAQ Chronic Control issues engineering and Replacement. 2012
 17 Ref Ref PETRO KEMYA

SABIC

Weighting system renovation “load cells” 2012
 18 Ref Ref Kemay-Sabic Intools update project 2010-2012